A make-to-order manufacturer

One schedule for the whole floor

A manufacturer running several kinds of machines across more than one building, with a steady flow of jobs that never look the same two weeks in a row.

Where they started

  • The schedule and billing lived in separate spreadsheets.
  • Changes were marked by hand, and the week was rebuilt every Monday.
  • Whether a rush job fit depended on who you asked.

What changed

  • One place to see whether a rush job fits.
  • The week rebalances as it moves, instead of being rebuilt on Monday.
  • Materials are ordered, received and used without retyping.
  • Finance reviews changes to the plan instead of discovering them.

How it rolled out

  1. 1

    Discovery

    We learned how the floor really runs.

  2. 2

    Clickable demo

    The team saw and signed off on the real thing first.

  3. 3

    Training

    Short sessions for each team that would use it.

  4. 4

    Side by side

    It ran next to the old way for a month before the switch.

  5. 5

    Kept growing

    Billing, alerts and the assistant were added once it was live.