Parallel Strategies

Manufacturing softwareTool example

The floor’s numbers, right next to the plan.

Crews record units as they go, so everyone sees what is done, what is left and what is late.

Book a fit check

A short call. You leave with a plan and a price.

This week — production entry
JobServicePlannedDoneLeft
Bracket orderFinishing1,200840360
Housing runAssembly4,5004,500Complete
Panel kitsPackaging600120Behind
Prototype batchMachining2500Starts Thu

Sample screen with made-up data.

Before

  • Counts arrive days later, if at all.
  • Nobody can say what is left without asking around.
  • Late jobs surface at the end of the week.

With the tool

  • Units recorded per job, service and day.
  • Done and left, side by side with the plan.
  • Overdue work flagged and cleared in bulk.

What it does

Quick entry

Add units, set a total or enter what is left, for each service in each week.

Complete at any level

Finish a service, a whole job or a whole week in one click. Finished work closes out its plan.

Plan vs actual

A report that lines up planned units with recorded ones, job by job and week by week.

More than one building

Split a job across sites and track each one on its own, with totals that add up.

Import from Excel

Upload counts from a spreadsheet. Rows are matched to jobs, and anything unmatched is set aside to sort by hand.

Overdue clean-up

See every job past its date in one list and close out the finished ones together.

How it is used, start to finish

  1. 1

    The plan is set

    Units per service per day, from the schedule.

  2. 2

    Crews record

    Counts go in as work is done, on any screen.

  3. 3

    The plan updates

    What is left is spread over the days remaining.

  4. 4

    Review the week

    Plan vs actual, and what needs attention next.

From a partner story

Counts from the floor land next to the plan the same day, not at the end of the week.

Comes with every build

Alerts that matter

Email alerts for the things you choose: a job cancelled, a date moved, a late start, a price change.

Roles and access

Each person sees the screens their job needs, and nothing they should not change.

A full history

Every change to a job is recorded: who, when, and what it was before.

Questions we get asked

Do we have to replace our ERP?

No. What we build works beside the system you already run and reads from it where it can. Nothing gets migrated.

Can we start with just one of these tools?

Yes. The schedule is the usual place to start, and the rest can be added once it is part of the week.

Will it match how our floor works?

That is the point. It is built around your machines, your rules and your words, and you see a clickable demo before we build it out.

What happens to our spreadsheets?

We bring the data across, and the new tool can run beside the old way until your team is ready to switch.

Want one built around how you work?

A short call, no obligation. If we are not the right team, we will say so.